Monday, April 13, 2015

April 13


Bruce and I (mostly Bruce) worked over the weekend to put insulation in the master suite. The old stuff was pretty gross and a lower R-value.

Master bath before




master bath with new insulation


North wall


We had limited time because the sheetrock team came in Monday morning.


They ran out of materials by noon. This is what they got done.


Looking into the master bathroom



Jed came back to install some hardware in the hall bathroom and hang the mirror. 


Notice the towel bars and curtain rod.